PROJECT CONTRACTOR ESTIMATED COST FUNDING COMPLETION DATE
Additional leaf clean-up (weather permitting) – before March

clean-up

LFB Landscaping $500 Operating 1/22/18
Schedule/confirm oil delivery by Brinker’s mid-cycle – January Continental Property Management N/A N/A 1/23/18
Maintain $28/unit/cycle maintenance fee for unit owners serviced by central boiler system Continental Property Management $28/month

per cycle

Operating

GL “5151”

1/23/18
Install three (3) LED floodlights facing Aspen Way at Buildings 3 and 7 Frank’s Lighting $2,451 Operating 1/23/18
Stucco repairs at 3-17 and 13-3 John DePaul Masonry $1,870 Operating 1/24/18
Replace batteries to sump pumps at boiler rooms M-10, M-23, and   M-25 Lizell Contracting $804 Operating

GL “6540”

1/30/18
Chip Christmas trees – Install in wood chip beds LFB Landscaping $700 Operating 2/2/18
Tree removal and stump grinding – 14 trees (from 9/12/17 inspection) TreeEx $3,361 Operating 2/2/18
Improve storm water drainage at sidewalk at front of 1-3 / 1-4 LFB Landscaping $1,200 Operating 2/2/18
2017 financial report

(audit required by documents)

Luft &

Company

$2,100 Operating 2/4/18
Install 10-foot signpost and replace damaged “stop” sign at Aspen Way/Lower State Road HD Supply

(Purchase)

 

Lizell Contracting
(Install)

$397

 

 

Hourly

Rate

Operating 2/5/18
Mold remediation in common area attic above 2-7 Environmental

Mold Solutions

$2,480 Operating 2/9/18
Remove oak tree and grind stump at side of 8-8 TreeEx $1,080 Operating 2/12/18