PROJECT | CONTRACTOR | ESTIMATED COST | FUNDING | COMPLETION DATE |
Install 18 ft length handrail at steps – right side of 2-33 | Lester Leedom | $583 | Operating | 3/12/15 |
Inspect 26 fire extinguishers in boiler rooms/ maintenance room (service at extra cost) | Shapiro Fire Protection | $458 | Operating
GL “6540” |
3/16/15 |
Removal of leaves/debris from inside all trash enclosure areas | Lizell
Contracting |
$924 | Operating | 3/17/15 |
Removal of leaves/debris from inside all fenced-in above-ground oil tank locations | Lizell Contracting | $561 | Operating
GL “6540” |
3/18/15 |
Tree removal and stump grinding at
fifteen (15) locations along the outer perimeter of Aspen Way |
Willow Tree | $725 | Operating | 3/19/15 |
Power wash dirt, mildew, and algae at
21 locations, 2,551 sq ft |
Rolling Suds | $1,100 | Operating | 3/23/15 |
Power wash 35 trash enclosure areas
(all except 12-3) |
Rolling Suds | $3,200
(2014 Price – $3,200) |
Operating | 3/23/15 |
Mail letter to townhouse unit owners – Architectural guidelines, clean fireplace, service oil burner and air conditioning unit | Continental Property Management | Copying
& Postage |
Operating | 3/25/15 |
Mail letter to non-townhouse unit owners/ residents – Architectural guidelines, trash rules, service air conditioning units, paint door, stain balcony handrail/ balusters and fence | Continental Property Management | Copying
& Postage |
Operating | 3/25/15 |
Repair underneath side of balcony at
left side of 7-9 |
John DePaul Masonry | $895 | Operating | 3/26/15 |
Clean 49 light fixtures above doorways | Lizell
Contracting |
$546
(October 2013 Price – $546) |
Operating | 3/31/15 |
Fertilize all azaleas and rhododendrons with “holly-tone” – per contract | LFB Landscaping | $900 | Operating | 3/31/15 |
Tree removal and stump grinding at
four (4) locations |
Willow Tree | $220 | Operating | 4/3/15 |
Remove sixteen (16) overgrown shrubs and grind stumps | Willow Tree | $425 | Operating | 4/3/15 |
Stucco repairs at eleven (11) locations | John DePaul Masonry | $3,573 | Operating | 4/6/15 |
Select 1” mulch option | LFB Landscaping | 1” – $9,076
(1” selected 2014) |
Operating | 4/8/15 |