PROJECT | CONTRACTOR | ESTIMATED COST | FUNDING | COMPLETION DATE |
Replace electric meter panel box –
2-1, 2-2 |
Frank’s Lighting | $2,195 | Reserve | 9/1/15 |
Installation of topsoil, seed, and starter fertilizer – 14,268 sq ft | LFB Landscaping | $5,367 | Operating | 9/1/15 |
Replace electric meter panel box –
3-1, 3-2, M-8 |
Frank’s Lighting | $2,283 | Reserve | 9/2/15 |
Replace electric meter panel box –
3-15, 3-16 |
Frank’s Lighting | $2,195 | Reserve | 9/3/15 |
Replace electric meter panel box –
3-3, 3-4 |
Frank’s Lighting | $2,195 | Reserve | 9/8/15 |
Tree pruning, removal, and stump grinding at five (5) locations | Willow Tree | $375 | Operating | 9/8/15 |
Replace electric meter panel box –
3-9, 3-10, M-9 |
Frank’s Lighting | $2,283 | Reserve | 9/9/15 |
Replace electric meter panel box –
4-5, 4-9, 4-10 |
Frank’s Lighting | $3,671 | Reserve | 9/10/15 |
Replace electric meter panel box –
12-1, 12-2, 12-12 |
Frank’s Lighting | $3,671 | Reserve | 9/15/15 |
Mail cover letter and heating system booklet to all unit owners/residents | Continental Property Management | Copying and Mailing | N/A | 9/15/15 |
Removal of leaves/debris from inside all fenced-in above-ground oil tank locations | Lizell Contracting | Hourly Rate | Operating
GL “6540” |
9/15/15 |
Replace electric meter panel box –
5-12, 5-19, 5-20 |
Frank’s Lighting | $3,671 | Reserve | 9/16/15 |
Replace electric meter panel box –
5-14, 5-15, 5-16 |
Frank’s Lighting | $3,671 | Reserve | 9/17/15 |
Install handrail at steps at 12-8 | Lester Leedom | $424 | Operating | 9/21/15 |
Replace electric meter panel box –
6-5, 6-6, 6-7 |
Frank’s Lighting | $3,671 | Reserve | 9/22/15 |
Building inspection – Create list of areas to power wash by 2/28/16 | Continental Property Management | N/A | N/A | 9/22/15 |
Replace electric meter panel box –
6-3, 6-10, 6-11 |
Frank’s Lighting | $3,671 | Reserve | 9/23/15 |
Replace electric meter panel box –
6-1, 6-2, 6-12 |
Frank’s Lighting | $3,671 | Reserve | 9/24/15 |
Replace electric meter panel box –
7-8, 7-12, 7-13 |
Frank’s Lighting | $3,671 | Reserve | 9/29/15 |
Replace electric meter panel box –
7-1, 7-2, 7-21 |
Frank’s Lighting | $3,671 | Reserve | 9/30/15 |
Replace electric meter panel box –
11-9, 11-10, 11-11 |
Frank’s Lighting | $3,671 | Reserve | 10/1/15 |
Turn on all boilers M-1 to M-25 | Continental
Property Management |
N/A | N/A | 10/6/15 |
Remove 40 ft tall hemlock tree near
7-20 near electric meter panel box |
Keystone Tree | $340 | Operating | 10/6/15 |