PROJECT | CONTRACTOR | ESTIMATED COST | FUNDING | COMPLETION DATE |
Replace electric meter panel box –
7-22, 7-23 |
Frank’s Lighting | $2,195 | Reserve | 4/19/16 |
Replace electric meter panel box –
7-7, 7-14, 7-15 |
Frank’s Lighting | $3,671 | Reserve | 4/20/16 |
Replace electric meter panel box –
7-5, 7-6, 7-16 |
Frank’s Lighting | $3,671 | Reserve | 4/21/16 |
Concrete sidewalk repairs at six locations | John DePaul Masonry | $1,159 | Operating | 4/21/16 |
Replace electric meter panel box –
4-6, 4-7, 4-8 |
Frank’s Lighting | $3,671 | Reserve | 4/25/16 |
Replace electric meter panel box –
5-7, 5-8, 5-9 |
Frank’s Lighting | $3,671 | Reserve | 4/26/16 |
Replace electric meter panel box –
5-10, 5-11, 5-21 |
Frank’s Lighting | $3,671 | Reserve | 4/27/16 |
Landscaping improvements – Hillside area between Building 3 and 7, and improve storm water drainage | LFB Landscaping | $2,045 | Operating | 4/29/16 |
Replace electric meter panel box –
2-15, 2-16, 2-23 |
Frank’s Lighting | $3,671 | Reserve | 5/2/16 |
Replace electric meter panel box –
2-19, 2-20, 2-21 |
Frank’s Lighting | $3,671 | Reserve | 5/3/16 |
Detailed tree pruning – According to specifications | TreeEx | $6,545
(2015 Price $5,550 – Bair Tree) |
Operating | 5/3/16 |
Replace electric meter panel box –
2-14, 2-24, 2-25 |
Frank’s Lighting | $3,671 | Reserve | 5/4/16 |
Deep-root fertilization of three (3) large sycamore trees (one-year cycle) | Davey Tree | $180 | Operating | 5/6/16 |
Replace electric meter panel box –
2-9, 2-10, M-4 |
Frank’s Lighting | $2,139 | Reserve | 5/9/16 |
Replace electric meter panel box –
2-7, 2-8 |
Frank’s Lighting | $2,195 | Reserve | 5/10/16 |
Replace electric meter panel box –
2-31, 2-32, M-2 |
Frank’s Lighting | $2,139 | Reserve | 5/11/16 |
Removal of leaves/debris from inside all fenced-in above-ground oil tank locations | Lizell Contracting | $432 | Operating
GL “6540” |
5/11/16 |
Stucco repairs at three (3) locations | John DePaul
Masonry |
$1,365 | Operating | 5/11/16 |
May gutter cleaning (per contract) | LFB Landscaping | $650 | Operating
GL “6522” |
5/16/16 |
Replace electric meter panel box –
2-5, 2-6 |
Frank’s Lighting | $2,195 | Reserve | 5/16/16 |
Replace electric meter panel box –
2-35, 2-36, M-2 |
Frank’s Lighting | $2,283 | Reserve | 5/17/16 |
Install summer annuals at selected mulch beds | Council | To Be
Determined |
Operating | 5/18/16 |
Turn off all boilers – M-1 thru M-25 | Continental Property Management | N/A | N/A | 5/19/16 |