PROJECT CONTRACTOR ESTIMATED

COST

FUNDING COMPLETION DATE
Turn on water to all exterior spigots at 25 boiler rooms and install hoses Lizell Contracting $231 Operating 2/21/17
Removal of leaves/debris/snow from inside all fenced-in above-ground oil tank locations Lizell Contracting $264 Operating

GL “6540”

2/22/17
Mail exterior building power washing letter to community Continental Property Management Copying/

Postage

Operating 3/6/17
Lubricate locks at boiler room doors, M-1 through M-25, repair/replace as necessary Lizell Contracting $197 Operating

GL “6540”

3/6/17
Powerwashing floor, interior wall, top, and exterior wall of 35 trash enclosure areas Rolling Suds (Before Installation of Mulch) $3,200

 

(2016 Cost – $3,200)

Operating 3/6/17
Fill large potholes on Aspen Way near Building 11 Lizell Contracting $301 Operating 3/7/17
Develop specifications for 2017 asphalt paving project Bustamante Engineers $1,300 Operating 3/8/17
Removal of leaves/debris/snow from inside all trash enclosure areas Lizell Contracting $483 Operating 3/9/17
Inspect 26 fire extinguishers in boiler rooms/ maintenance room (service at extra cost) Shapiro Fire

Protection

$291 Operating

GL “6540”

3/10/17
Assess $250 oil maintenance charge to seven (7) unit owners who have not scheduled service call with Leonard Rose & Sons Continental

Property Management

N/A N/A 3/16/17