Turn on water to all exterior spigots at 25 boiler rooms and install hoses | Lizell Contracting | $231 | Operating | 2/21/17 |
Removal of leaves/debris/snow from inside all fenced-in above-ground oil tank locations | Lizell Contracting | $264 | Operating
GL “6540” |
2/22/17 |
Mail exterior building power washing letter to community | Continental Property Management | Copying/
Postage |
Operating | 3/6/17 |
Lubricate locks at boiler room doors, M-1 through M-25, repair/replace as necessary | Lizell Contracting | $197 | Operating
GL “6540” |
3/6/17 |
Powerwashing floor, interior wall, top, and exterior wall of 35 trash enclosure areas | Rolling Suds (Before Installation of Mulch) | $3,200
(2016 Cost – $3,200) |
Operating | 3/6/17 |
Fill large potholes on Aspen Way near Building 11 | Lizell Contracting | $301 | Operating | 3/7/17 |
Develop specifications for 2017 asphalt paving project | Bustamante Engineers | $1,300 | Operating | 3/8/17 |
Removal of leaves/debris/snow from inside all trash enclosure areas | Lizell Contracting | $483 | Operating | 3/9/17 |
Inspect 26 fire extinguishers in boiler rooms/ maintenance room (service at extra cost) | Shapiro Fire
Protection |
$291 | Operating
GL “6540” |
3/10/17 |
Assess $250 oil maintenance charge to seven (7) unit owners who have not scheduled service call with Leonard Rose & Sons | Continental
Property Management |
N/A | N/A | 3/16/17 |